Hornby OO Gauge R3983SS LNER Green 2-8-2 Class P2 No.2007 'Prince of Wales' with Steam Generator
You need to choose options for product.
-7%
files/DSC_2454.jpg
files/DSC_2457.jpg
files/DSC_2456.jpg
files/DSC_2455.jpg
Hornby OO Gauge R3983SS LNER Green 2-8-2 Class P2 No.2007 'Prince of Wales' with Steam Generator
The London and North Eastern Railway (LNER) Edinburgh to Aberdeen route had steep gradients and tight curves and the express passenger service was usually worked by a double header of two small engines. To overcome this situation, Nigel Gresley, Chief Mechanical Engineer (CME) of the LNER began designing a new locomotive at the LNER Doncaster Works in 1932.
The 2-8-2 configured locomotive was given the classification P2 and had four driving axles for greater adhesion, an A3 type boiler and a Kylchap type blastpipe/chimney system. A total of six of the Class were built. As the first two were returned to Doncaster for repairs they were fitted with streamlined fronts similar to the A4 Pacifics. The last four to be built were outshopped with streamlined fronts.
By 1944 the whole Class had been withdrawn. The 'A1 Trust', builders of the A1 locomotive 'Tornado', are currently in the process of building a continuation of the P2 class; 2007 'Prince of Wales'. Whilst this locomotive will be based off of 2001 'Cock o' the North', 2007 will incorporate some changes such as sharing a boiler design with A1 'Tornado' and incorporating an improved pony truck design.
Specification:
DCC Ready 21 pin socket
5 Pole Skew wound motor
Minimum curve is 2nd radius
Hornby OO Gauge R3983SS LNER Green 2-8-2 Class P2 No.2007 'Prince of Wales' with Steam Generator
Item Number (SKU)R3983SS
-7%
Hornby OO Gauge R3983SS LNER Green 2-8-2 Class P2 No.2007 'Prince of Wales' with Steam Generator
The London and North Eastern Railway (LNER) Edinburgh to Aberdeen route had steep gradients and tight curves and the express passenger service was usually worked by a double header of two small engines. To overcome this situation, Nigel Gresley, Chief Mechanical Engineer (CME) of the LNER began designing a new locomotive at the LNER Doncaster Works in 1932.
The 2-8-2 configured locomotive was given the classification P2 and had four driving axles for greater adhesion, an A3 type boiler and a Kylchap type blastpipe/chimney system. A total of six of the Class were built. As the first two were returned to Doncaster for repairs they were fitted with streamlined fronts similar to the A4 Pacifics. The last four to be built were outshopped with streamlined fronts.
By 1944 the whole Class had been withdrawn. The 'A1 Trust', builders of the A1 locomotive 'Tornado', are currently in the process of building a continuation of the P2 class; 2007 'Prince of Wales'. Whilst this locomotive will be based off of 2001 'Cock o' the North', 2007 will incorporate some changes such as sharing a boiler design with A1 'Tornado' and incorporating an improved pony truck design.